What will Highway 107 look like when the road project is done?
Amazing. Redevelopment is already underway to get the corridor ready for new structures. The road is designed to reduce traffic accidents and increase both the volume and flow of traffic. The project will accommodate 4 lanes of traffic, plus an additional turn lane of traffic headed North into Asheville Highway. Two outdated bridges will be replaced, one at Jackson Paper and one at Innovation Brewing. Aging water and sewer infrastructure will also be installed, as well as new light poles. Failed “box culvert drainage systems will be replaced by 7 foot culverts to accommodate better drainage. Sinkholes will be fixed, and there will be better erosion control.